The works comprised of a full M&E fit-out across two floors of office building. Prior to commencing the fit-out works DL M&E completed the strip-out of all existing services which included the removal of the heating system and gas supply to the building being capped.
DL M&E carried out the full HVAC installation which included the 2 no. Mitsubishi heat recovery air-conditioning system to provide heating and cooling, 1 no. system per floor and Mitsubishi DX Split System installed within the Comm’s Room. The ventilation strategy was primarily natural ventilation via openable windows which included a traffic light CO2 monitoring device. There was also mechanical ventilation via 2 no. Mitsubishi Lossnay Units for rooms with no access to openable windows. New extract systems were installed for the WC and Tea Point areas. There was new mains cold water pipework to all outlets to each of the WC Areas and Tea Points that were equipped with local electric water heaters, also with Zip Taps installed in the Tea Points.
There was new power distribution installed throughout the ground and first floor. New Thorlux LED lighting was also installed throughout with the Thorlux control system. The fire alarm system that was installed was an analogue addressable multi-zone c/w fully monitored automatic fire alarm control and indicator panel. Due to the nature of the building, full new CCTV, PA, Intruder Alarm, Public Affray, Access Control and Induction Loop systems were installed.